A GPRS Case Study

Phased Dual GPR Application Slashes Utility Mapping Time for Data Center

Phased Dual GPR Application Slashes Utility Mapping Time for Data Center

Highlights

THE BOTTOM LINE

The combination of high-speed GPR and traditional scanning provided a clear picture of 530 acres of buried drainage lines in just 46 days

INDUSTRY

Telecommunications, Power, Water, Wastewater

SERVICE

High-Speed GPR and Traditional Utility Locating, Utility Maps

LOCATION

GPRS Insight

Deliverables

Site markings, Job Services Report, layered digital utility map in SiteMap

PROJECT APPLICATION

ASK

Download PDF

Task

Provide comprehensive drain line mapping for 1,500 acres of land in the Midwest for new data center construction

PROBLEM

  • The client needed accurate utility location and mapping of existing drainage lines to effectively plan construction on their 1,500-acre site
  • Planning & design required the immediate location of key drain lines over a 30-acre area with an additional 500 acres of drain lines mapped at minimum prior to construction
  • Much of the site was open land with few aboveground facility markers

Solution

  • A GPRS team including the estimator and the Senior V.P. of Field Support devised a multi-phase solution that would be comprehensive, cost effective, and fast: A multi-phased, dual application approach utilizing traditional GPR and a high-speed GPR array
  • In just 46 days, two Project Managers mapped 530 acres:

    • Phase I: 30 acres of GPR & high-speed GPR array use to target key drain lines
    • Phase II: 500 acres of GPR & high-speed GPR array use to find and map drain lines
    • Additional phases may include scaling the high-speed array scanning over the remaining 1,500-acres

Benefits

  • The project planning and construction can proceed, building any additional drainage around the existing subsurface infrastructure
  • The remaining 1,000 acres can be covered more easily based on Phase I and Phase II findings
  • Should the client elect for a comprehensive full site locate, the initial drainage phases will speed those results

CASE STUDY GALLERY

Icon - Elements Webflow Library - BRIX Templates
Icon - Elements Webflow Library - BRIX Templates
Icon - Elements Webflow Library - BRIX Templates
Icon - Elements Webflow Library - BRIX Templates
No items found.
arcadis
“Our team was more effective and efficient because of SiteMap, allowing us to provide better results from more informed decision-making.”
Alexander Valigosky
Project Environmental Scientist