 |
The new Renaissance Hotel by Marriott at the North Hills mall in Raleigh, North Carolina needed the post-tensioned cable and rebar located prior to coring through the concrete. Mitch Ross of Ground Penetrating Radar Systems has worked several days on this job site, scanning over 100 separate areas and marking the reinforcing steel on the concrete. When the concrete is cut later, they are able to cut and core without hitting and damaging the reinforcing in the building. The GPR also shows the depth of the reinforcing steel in the concrete.
Mitch Ross runs GPRS operations in North Carolina He can be reached in Raleigh at (919) 671-9476 or by email at mitch.ross@gp-radar.com. Concrete scanning for the purposes of identifying the location of rebar and post-tensioning is the most frequent service performed by the GPR technicians at GPRS.

PT Cable and Rebar marked directly on concrete at the Renaissance Hotel in Raleigh, NC.
|
 |
|
 |
 |
| When the ownership of a Best Western
Hotel in Cocoa, FL needed to add a parapet wall to their roof
for an updated look they contact GPRS, Inc. |
| Click
To Read More... |
 |
| Ground Penetrating Radar Systems
has been working with Gallatin Steel at their Ghent, KY facility
to assist in identifying the location of underground utilities
prior to their excavations. |
| Click
To Read More... |
 |
| When Harlem Township in Delaware
County, Ohio took control of a cemetery dating back to 1830
they needed to make sure that they had as much information
about what was under the ground as possible. |
| Click
To Read More... |
 |
| When Lincoln Property Company
of Orlando, FL needed to add parking loops to the entrance
and exit of a parking garage without hitting any post tensioned
cables they contacted GPRS, Inc of Orlando, FL. |
| Click
To Read More... |
 |
| When Net Jets, a Berkshire Hathaway
company decided to add pillars to the new mezzanine area they
had concerns that the existing concrete would not be thick
enough to support each of the six pillars. |
| Click
To Read More... |
 |
| When GameTime designs a playground
installation, they have to concerns regarding underground
utilities. First, that when they dig the footers for the equipment,
they do not cut or damage any underground utilities. |
| Click
To Read More... |
 |
| When Hydrologic Associates USA,
Inc. in Miami, FL needed to survey a former gas station to
locate any underground storage tanks (UST’s) that may
still be onsite, they contact Ground Penetrating Radar Systems,
Inc. |
| Click
To Read More... |
 |
| When an aerospace design and testing
company in Winston-Salem, North Carolina needed to redesign
their testing sled, they wanted to do so without damaging
any reinforcing in their concrete |
| Click
To Read More... |
 |
| In February of 2008, Ground Penetrating
Radar Systems was contracted by IVI Environmental to perform
Underground Storage Tank surveys at 5 sites throughout the
southeast. |
| Click
To Read More... |
 |
|
 |
 |
|