Government Agencies
Visit the GPRS Facebook Page
Visit the GPRS Linkedin Profile
 


 
 
 
 
 

GPR Makes Multiple Penetrations Through the
Post Tension Reinforced Concrete Slab

GPR Makes Multiple Penetrations in FloridaA contractor was planning to make sever penetrations on a post tension slab on grade at an office building in Palm Beach, FL. The contractor was planning to install new plumbing drains and had to make multiple penetrations through the post tension reinforced concrete slab. The area they needed to have survey was roughly 20’x3’ in size. They contact Ground Penetrating Radar Systems knowing that this was the exact type of work they specialize in.

Once on site GPRS used their 1600MHz antenna, specifically designed to provide high resolution concrete images of the precise location of the rebar, post tension cables and electrical conduit. Ground penetrating radar is an effective and efficient tool for accomplishing these goals and GPRS has the area mapped on the surface of the concrete in less than 30 minutes. Once the marking was complete the ground penetrating radar technician took time to explain the results so they contract would know exactly where to drill. This ensured that the building did not face and structural damage and, more importantly, that the contractor was safe during the drilling process. All parties were pleased with the results and the holes were drilled without incident.

You will see a picture mapping the rebar and post tension cables on the surface. Notice that the uniform post-tension cables in red. All of the green markings are of the rebar in the slab. If you would like to receive a proposal for similar work, please contact Ron Anderson / GPRS operations in the South Florida. He is based in Miami, FL and he can be reached at (305) 801-4138 or by email at ron.anderson@gp-radar.com.

 

Privacy Policy